ProjectTaskFields enumeration

Specifies the task fields that are available as a parameter for the getTaskFieldAsync method.

Hosts: Project
Added in 1.0
Microsoft.Office.WebExtension.ProjectTaskFields={
    ActualCost: 0, 
    ActualDuration: 1, 
    ActualFinish: 2, 
    ActualOvertimeCost: 3, 
    ActualOvertimeWork: 4, 
    ActualStart: 5, 
    ActualWork: 6, 
    Text1: 7, 
    Text10: 8, 
    Finish10: 9, 
    Start10: 10, 
    Text11: 11, 
    Text12: 12, 
    Text13: 13, 
    Text14: 14, 
    Text15: 15, 
    Text16: 16, 
    Text17: 17, 
    Text18: 18, 
    Text19: 19, 
    Finish1: 20, 
    Start1: 21, 
    Text2: 22, 
    Text20: 23, 
    Text21: 24, 
    Text22: 25, 
    Text23: 26, 
    Text24: 27, 
    Text25: 28, 
    Text26: 29, 
    Text27: 30, 
    Text28: 31, 
    Text29: 32, 
    Finish2: 33, 
    Start2: 34, 
    Text3: 35, 
    Text30: 36, 
    Finish3: 37, 
    Start3: 38, 
    Text4: 39, 
    Finish4: 40, 
    Start4: 41, 
    Text5: 42, 
    Finish5: 43, 
    Start5: 44, 
    Text6: 45, 
    Finish6: 46, 
    Start6: 47, 
    Text7: 48, 
    Finish7: 49, 
    Start7: 50, 
    Text8: 51, 
    Finish8: 52, 
    Start8: 53, 
    Text9: 54, 
    Finish9: 55, 
    Start9: 56, 
    Baseline10BudgetCost: 57, 
    Baseline10BudgetWork: 58, 
    Baseline10Cost: 59, 
    Baseline10Duration: 60, 
    Baseline10Finish: 61, 
    Baseline10FixedCost: 62, 
    Baseline10FixedCostAccrual: 63, 
    Baseline10Start: 64, 
    Baseline10Work: 65, 
    Baseline1BudgetCost: 66, 
    Baseline1BudgetWork: 67, 
    Baseline1Cost: 68, 
    Baseline1Duration: 69, 
    Baseline1Finish: 70, 
    Baseline1FixedCost: 71, 
    Baseline1FixedCostAccrual: 72, 
    Baseline1Start: 73, 
    Baseline1Work: 74, 
    Baseline2BudgetCost: 75, 
    Baseline2BudgetWork: 76, 
    Baseline2Cost: 77, 
    Baseline2Duration: 78, 
    Baseline2Finish: 79, 
    Baseline2FixedCost: 80, 
    Baseline2FixedCostAccrual: 81, 
    Baseline2Start: 82, 
    Baseline2Work: 83, 
    Baseline3BudgetCost: 84, 
    Baseline3BudgetWork: 85, 
    Baseline3Cost: 86, 
    Baseline3Duration: 87, 
    Baseline3Finish: 88, 
    Baseline3FixedCost: 89, 
    Baseline3FixedCostAccrual: 90, 
    Basline3Start: 91, 
    Baseline3Work: 92, 
    Baseline4BudgetCost: 93, 
    Baseline4BudgetWork: 94, 
    Baseline4Cost: 95, 
    Baseline4Duration: 96, 
    Baseline4Finish: 97, 
    Baseline4FixedCost: 98, 
    Baseline4FixedCostAccrual: 99, 
    Baseline4Start: 100, 
    Baseline4Work: 101, 
    Baseline5BudgetCost: 102, 
    Baseline5BudgetWork: 103, 
    Baseline5Cost: 104, 
    Baseline5Duration: 105, 
    Baseline5Finish: 106, 
    Baseline5FixedCost: 107, 
    Baseline5FixedCostAccrual: 108, 
    Baseline5Start: 109, 
    Baseline5Work: 110, 
    Baseline6BudgetCost: 111, 
    Baseline6BudgetWork: 112, 
    Baseline6Cost: 113, 
    Baseline6Duration: 114, 
    Baseline6Finish: 115, 
    Baseline6FixedCost: 116, 
    Baseline6FixedCostAccrual: 117, 
    Baseline6Start: 118, 
    Baseline6Work: 119, 
    Baseline7BudgetCost: 120, 
    Baseline7BudgetWork: 121, 
    Baseline7Cost: 122, 
    Baseline7Duration: 123, 
    Baseline7Finish: 124, 
    Baseline7FixedCost: 125, 
    Baseline7FixedCostAccrual: 126, 
    Baseline7Start: 127, 
    Baseline7Work: 128, 
    Baseline8BudgetCost: 129, 
    Baseline8BudgetWork: 130, 
    Baseline8Cost: 131, 
    Baseline8Duration: 132, 
    Baseline8Finish: 133, 
    Baseline8FixedCost: 134, 
    Baseline8FixedCostAccrual: 135, 
    Baseline8Start: 136, 
    Baseline8Work: 137, 
    Baseline9BudgetCost: 138, 
    Baseline9BudgetWork: 139, 
    Baseline9Cost: 140, 
    Baseline9Duration: 141, 
    Baseline9Finish: 142, 
    Baseline9FixedCost: 143, 
    Baseline9FixedCostAccrual: 144, 
    Baseline9Start: 145, 
    Baseline9Work: 146, 
    BaselineBudgetCost: 147, 
    BaselineBudgetWork: 148, 
    BaselineCost: 149, 
    BaselineDuration: 150, 
    BaselineFinish: 151, 
    BaselineFixedCost: 152, 
    BaselineFixedCostAccrual: 153, 
    BaselineStart: 154, 
    BaselineWork: 155, 
    BudgetCost: 156, 
    BudgetWork: 157, 
    TaskCalendarGUID: 158, 
    ConstraintDate: 159, 
    ConstraintType: 160, 
    Cost1: 161, 
    Cost10: 162, 
    Cost2: 163, 
    Cost3: 164, 
    Cost4: 165, 
    Cost5: 166, 
    Cost6: 167, 
    Cost7: 168, 
    Cost8: 169, 
    Cost9: 170, 
    Date1: 171, 
    Date10: 172, 
    Date2: 173, 
    Date3: 174, 
    Date4: 175, 
    Date5: 176, 
    Date6: 177, 
    Date7: 178, 
    Date8: 179, 
    Date9: 180, 
    Deadline: 181, 
    Duration1: 182, 
    Duration10: 183, 
    Duration2: 184, 
    Duration3: 185, 
    Duration4: 186, 
    Duration5: 187, 
    Duration6: 188, 
    Duration7: 189, 
    Duration8: 190, 
    Duration9: 191, 
    Duration: 192, 
    EarnedValueMethod: 193, 
    FinishSlack: 194, 
    FixedCost: 195, 
    FixedCostAccrual: 196, 
    Flag10: 197, 
    Flag1: 198, 
    Flag11: 199, 
    Flag12: 200, 
    Flag13: 201, 
    Flag14: 202, 
    Flag15: 203, 
    Flag16: 204, 
    Flag17: 205, 
    Flag18: 206, 
    Flag19: 207, 
    Flag2: 208, 
    Flag20: 209, 
    Flag3: 210, 
    Flag4: 211, 
    Flag5: 212, 
    Flag6: 213, 
    Flag7: 214, 
    Flag8: 215, 
    Flag9: 216, 
    FreeSlack: 217, 
    HasRollupSubTasks: 218, 
    ID: 219, 
    Name: 220, 
    Notes: 221, 
    Number1: 222, 
    Number10: 223, 
    Number11: 224, 
    Number12: 225, 
    Number13: 226, 
    Number14: 227, 
    Number15: 228, 
    Number16: 229, 
    Number17: 230, 
    Number18: 231, 
    Number19: 232, 
    Number2: 233, 
    Number20: 234, 
    Number3: 235, 
    Number4: 236, 
    Number5: 237, 
    Number6: 238, 
    Number7: 239, 
    Number8: 240, 
    Number9: 241, 
    ScheduledDuration: 242, 
    ScheduledFinish: 243, 
    ScheduledStart: 244, 
    OutlineLevel: 245, 
    OvertimeCost: 246, 
    OvertimeWork: 247, 
    PercentComplete: 248, 
    PercentWorkComplete: 249, 
    Predecessors: 250, 
    PreleveledFinish: 251, 
    PreleveledStart: 252, 
    Priority: 253, 
    Active: 254, 
    Critical: 255, 
    Milestone: 256, 
    Overallocated: 257, 
    IsRollup: 258, 
    Summary: 259, 
    RegularWork: 260, 
    RemainingCost: 261, 
    RemainingDuration: 262, 
    RemainingOvertimeCost: 263, 
    RemainingWork: 264, 
    ResourceNames: 265, 
    ResourceNames_deprecated: 266, 
    Cost: 267, 
    Finish: 268, 
    Start: 269, 
    Work: 270, 
    StartSlack: 271, 
    Status: 272, 
    Successors: 273, 
    StatusManager: 274, 
    TotalSlack: 275, 
    TaskGUID: 276, 
    Type: 277, 
    WBS: 278, 
    WBSPREDECESSORS: 279, 
    WBSSUCCESSORS: 280, 
    WSSID: 281
}

Members

The ProjectTaskFields enumeration contains the following members.

Name Value Description
ActualCost 0 The current actual cost for the task.
ActualDuration 1 The actual duration of the task, in minutes.
ActualFinish 2 The actual finish date of the task.
ActualOvertimeCost 3 The actual overtime cost for the task.
ActualOvertimeWork 4 The actual overtime work for the task, in minutes.
ActualStart 5 The actual start date of the task.
ActualWork 6 The actual work for the task, in minutes.
Text1 7 A text field for the task.
Text10 8 A text field for the task.
Finish10 9 A finish field for the task.
Start10 10 A start field for the task.
Text11 11 A text field for the task.
Text12 12 A text field for the task.
Text13 13 A text field for the task.
Text14 14 A text field for the task.
Text15 15 A text field for the task.
Text16 16 A text field for the task.
Text17 17 A text field for the task.
Text18 18 A text field for the task.
Text19 19 A text field for the task.
Finish1 20 A finish field for the task.
Start1 21 A start field for the task.
Text2 22 A text field for the task.
Text20 23 A text field for the task.
Text21 24 A text field for the task.
Text22 25 A text field for the task.
Text23 26 A text field for the task.
Text24 27 A text field for the task.
Text25 28 A text field for the task.
Text26 29 A text field for the task.
Text27 30 A text field for the task.
Text28 31 A text field for the task.
Text29 32 A text field for the task.
Finish2 33 A finish field for the task.
Start2 34 A start field for the task.
Text3 35 A text field for the task.
Text30 36 A text field for the task.
Finish3 37 A finish field for the task.
Start3 38 A start field for the task.
Text4 39 A text field for the task.
Finish4 40 A finish field for the task.
Start4 41 A start field for the task.
Text5 42 A text field for the task.
Finish5 43 A finish field for the task.
Start5 44 A start field for the task.
Text6 45 A text field for the task.
Finish6 46 A finish field for the task.
Start6 47 A start field for the task.
Text7 48 A text field for the task.
Finish7 49 A finish field for the task.
Start7 50 A start field for the task.
Text8 51 A text field for the task.
Finish8 52 A finish field for the task.
Start8 53 A start field for the task.
Text9 54 A text field for the task.
Finish9 55 A finish field for the task.
Start9 56 A start field for the task.
Baseline10BudgetCost 57 The budget cost for the baseline task.
Baseline10BudgetWork 58 The budget work for the baseline task, in hours.
Baseline10Cost 59 The cost for the baseline task.
Baseline10Duration 60 The duration for the baseline task, in minutes.
Baseline10Finish 61 The finish date for the baseline task.
Baseline10FixedCost 62 The fixed cost of any non-resource expense for the baseline task.
Baseline10FixedCostAccrual 63 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline10Start 64 The start date for the baseline task.
Baseline10Work 65 The total person-hours scheduled for the baseline task, in minutes.
Baseline1BudgetCost 66 The budget cost for the baseline task.
Baseline1BudgetWork 67 The budget work for the baseline task, in hours.
Baseline1Cost 68 The cost for the baseline task.
Baseline1Duration 69 The duration for the baseline task, in minutes.
Baseline1Finish 70 The finish date for the baseline task.
Baseline1FixedCost 71 The fixed cost of any non-resource expense for the baseline task.
Baseline1FixedCostAccrual 72 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline1Start 73 The start date for the baseline task.
Baseline1Work 74 The total person-hours scheduled for the baseline task, in minutes.
Baseline2BudgetCost 75 The budget cost for the baseline task.
Baseline2BudgetWork 76 The budget work for the baseline task, in hours.
Baseline2Cost 77 The cost for the baseline task.
Baseline2Duration 78 The duration for the baseline task, in minutes.
Baseline2Finish 79 The finish date for the baseline task.
Baseline2FixedCost 80 The fixed cost of any non-resource expense for the baseline task.
Baseline2FixedCostAccrual 81 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline2Start 82 The start date for the baseline task.
Baseline2Work 83 The total person-hours scheduled for the baseline task, in minutes.
Baseline3BudgetCost 84 The budget cost for the baseline task.
Baseline3BudgetWork 85 The budget work for the baseline task, in hours.
Baseline3Cost 86 The cost for the baseline task.
Baseline3Duration 87 The duration for the baseline task, in minutes.
Baseline3Finish 88 The finish date for the baseline task.
Baseline3FixedCost 89 The fixed cost of any non-resource expense for the baseline task.
Baseline3FixedCostAccrual 90 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline3Start 91 The start date for the baseline task.
Baseline3Work 92 The total person-hours scheduled for the baseline task, in minutes.
Baseline4BudgetCost 93 The budget cost for the baseline task.
Baseline4BudgetWork 94 The budget work for the baseline task, in hours.
Baseline4Cost 95 The cost for the baseline task.
Baseline4Duration 96 The duration for the baseline task, in minutes.
Baseline4Finish 97 The finish date for the baseline task.
Baseline4FixedCost 98 The fixed cost of any non-resource expense for the baseline task.
Baseline4FixedCostAccrual 99 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline4Start 100 The start date for the baseline task.
Baseline4Work 101 The total person-hours scheduled for the baseline task, in minutes.
Baseline5BudgetCost 102 The budget cost for the baseline task.
Baseline5BudgetWork 103 The budget work for the baseline task, in hours.
Baseline5Cost 104 The cost for the baseline task.
Baseline5Duration 105 The duration for the baseline task, in minutes.
Baseline5Finish 106 The finish date for the baseline task.
Baseline5FixedCost 107 The fixed cost of any non-resource expense for the baseline task.
Baseline5FixedCostAccrual 108 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline5Start 109 The start date for the baseline task.
Baseline5Work 110 The total person-hours scheduled for the baseline task, in minutes.
Baseline6BudgetCost 111 The budget cost for the baseline task.
Baseline6BudgetWork 112 The budget work for the baseline task, in hours.
Baseline6Cost 113 The cost for the baseline task.
Baseline6Duration 114 The duration for the baseline task, in minutes.
Baseline6Finish 115 The finish date for the baseline task.
Baseline6FixedCost 116 The fixed cost of any non-resource expense for the baseline task.
Baseline6FixedCostAccrual 117 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline6Start 118 The start date for the baseline task.
Baseline6Work 119 The total person-hours scheduled for the baseline task, in minutes.
Baseline7BudgetCost 120 The budget cost for the baseline task.
Baseline7BudgetWork 121 The budget work for the baseline task, in hours.
Baseline7Cost 122 The cost for the baseline task.
Baseline7Duration 123 The duration for the baseline task, in minutes.
Baseline7Finish 124 The finish date for the baseline task.
Baseline7FixedCost 125 The fixed cost of any non-resource expense for the baseline task.
Baseline7FixedCostAccrual 126 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline7Start 127 The start date for the baseline task.
Baseline7Work 128 The total person-hours scheduled for the baseline task, in minutes.
Baseline8BudgetCost 129 The budget cost for the baseline task.
Baseline8BudgetWork 130 The budget work for the baseline task, in hours.
Baseline8Cost 131 The cost for the baseline task.
Baseline8Duration 132 The duration for the baseline task, in minutes.
Baseline8Finish 133 The finish date for the baseline task.
Baseline8FixedCost 134 The fixed cost of any non-resource expense for the baseline task.
Baseline8FixedCostAccrual 135 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline8Start 136 The start date for the baseline task.
Baseline8Work 137 The total person-hours scheduled for the baseline task, in minutes.
Baseline9BudgetCost 138 The budget cost for the baseline task.
Baseline9BudgetWork 139 The budget work for the baseline task, in hours.
Baseline9Cost 140 The cost for the baseline task.
Baseline9Duration 141 The duration for the baseline task, in minutes.
Baseline9Finish 142 The finish date for the baseline task.
Baseline9FixedCost 143 The fixed cost of any non-resource expense for the baseline task.
Baseline9FixedCostAccrual 144 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Baseline9Start 145 The start date for the baseline task.
Baseline9Work 146 The total person-hours scheduled for the baseline task, in minutes.
BaselineBudgetCost 147 The budget cost for the baseline task.
BaselineBudgetWork 148 The budget work for the baseline task, in hours.
BaselineCost 149 The cost for the baseline task.
BaselineDuration 150 The duration for the baseline task, in minutes.
BaselineFinish 151 The finish date for the baseline task.
BaselineFixedCost 152 The fixed cost of any non-resource expense for the baseline task.
BaselineFixedCostAccrual 153 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
BaselineStart 154 The start date for the baseline task.
BaselineWork 155 The total person-hours scheduled for the baseline task, in minutes.
BudgetCost 156 The budget cost for the task.
BudgetWork 157 The budget work for the task, in hours.
TaskCalendarGUID 158 The GUID of the task calendar.
ConstraintDate 159 A constraint date for the task.
ConstraintType 160 A constraint type for the task: As Soon As Possible = 0, As Late As Possible = 1, Must Start On = 2, Must Finish On = 3, Start No Earlier Than = 4, Start No Later Than = 5, Finish No Earlier Than = 6, Finish No Later Than = 7.
Cost1 161 A cost field of the task.
Cost10 162 A cost field of the task.
Cost2 163 A cost field of the task.
Cost3 164 A cost field of the task.
Cost4 165 A cost field of the task.
Cost5 166 A cost field of the task.
Cost6 167 A cost field of the task.
Cost7 168 A cost field of the task.
Cost8 169 A cost field of the task.
Cost9 170 A cost field of the task.
Date1 171 A date field of the task.
Date10 172 A date field of the task.
Date2 173 A date field of the task.
Date3 174 A date field of the task.
Date4 175 A date field of the task.
Date5 176 A date field of the task.
Date6 177 A date field of the task.
Date7 178 A date field of the task.
Date8 179 A date field of the task.
Date9 180 A date field of the task.
Deadline 181 The deadline for a task.
Duration1 182 A duration field of the task.
Duration10 183 A duration field of the task.
Duration2 184 A duration field of the task.
Duration3 185 A duration field of the task.
Duration4 186 A duration field of the task.
Duration5 187 A duration field of the task.
Duration6 188 A duration field of the task.
Duration7 189 A duration field of the task.
Duration8 190 A duration field of the task.
Duration9 191 A duration field of the task.
Duration 192 A duration field of the task.
EarnedValueMethod 193 The method for calculating earned value for the task.
FinishSlack 194 The duration between the Early Finish and Late Finish dates for the task, in minutes.
FixedCost 195 The fixed cost for the task.
FixedCostAccrual 196 The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.
Flag10 197 A Boolean flag field for the task.
Flag1 198 A Boolean flag field for the task.
Flag11 199 A Boolean flag field for the task.
Flag12 200 A Boolean flag field for the task.
Flag13 201 A Boolean flag field for the task.
Flag14 202 A Boolean flag field for the task.
Flag15 203 A Boolean flag field for the task.
Flag16 204 A Boolean flag field for the task.
Flag17 205 A Boolean flag field for the task.
Flag18 206 A Boolean flag field for the task.
Flag19 207 A Boolean flag field for the task.
Flag2 208 A Boolean flag field for the task.
Flag20 209 A Boolean flag field for the task.
Flag3 210 A Boolean flag field for the task.
Flag4 211 A Boolean flag field for the task.
Flag5 212 A Boolean flag field for the task.
Flag6 213 A Boolean flag field for the task.
Flag7 214 A Boolean flag field for the task.
Flag8 215 A Boolean flag field for the task.
Flag9 216 A Boolean flag field for the task.
FreeSlack 217 The amount of time that the task can be delayed without delaying its successor tasks.
HasRollupSubTasks 218 Indicates whether the task has rollup subtasks.
ID 219 The index of the selected task. After the project summary task, the index of the first task in a project is 1.
Name 220 The name of the task.
Notes 221 The text value of the notes regarding the task.
Number1 222 A number field for the task.
Number10 223 A number field for the task.
Number11 224 A number field for the task.
Number12 225 A number field for the task.
Number13 226 A number field for the task.
Number14 227 A number field for the task.
Number15 228 A number field for the task.
Number16 229 A number field for the task.
Number17 230 A number field for the task.
Number18 231 A number field for the task.
Number19 232 A number field for the task.
Number2 233 A number field for the task.
Number20 234 A number field for the task.
Number3 235 A number field for the task.
Number4 236 A number field for the task.
Number5 237 A number field for the task.
Number6 238 A number field for the task.
Number7 239 A number field for the task.
Number8 240 A number field for the task.
Number9 241 A number field for the task.
ScheduledDuration 242 The scheduled (as opposed to actual) duration of the task.
ScheduledFinish 243 The scheduled (as opposed to actual) finish date of the task.
ScheduledStart 244 The scheduled (as opposed to actual) start date of the task.
OutlineLevel 245 The level of the task in the outline hierarchy.
OvertimeCost 246 The overtime cost for the task.
OvertimeWork 247 The overtime work for the task.
PercentComplete 248 The percent complete status of the task.
PercentWorkComplete 249 The percentage of work completed for the task.
Predecessors 250 The IDs of the task's predecessors.
PreleveledFinish 251 The finish date of a task before leveling occurred.
PreleveledStart 252 The start date of a task before leveling occurred.
Priority 253 The priority of the task, with values from 0 (low) to 1000 (high). The default priority value is 500.
Active 254 Indicates whether the task is active.
Critical 255 Indicates whether the task is on the critical path.
Milestone 256 Indicates whether the task is a milestone.
OverAllocated 257 Indicates whether any assignments for a task are overallocated.
IsRollup 258 Indicates whether subtask information is rolled up to the summary task bar.
Summary 259 Indicates whether the task is a summary task.
RegularWork 260 The amount of regular work for the task.
RemainingCost 261 The remaining cost for the task.
RemainingDuration 262 The remaining duration for the task, in minutes.
RemainingOvertimeCost 263 The remaining overtime cost for the task.
RemainingWork 264 The remaining work for the task, in minutes.
ResourceNames 265 The names of the resources assigned to a task.
ResourceNames_deprecated 266 The names of the resources assigned to a task.
Cost 267 The total cost of the task.
Finish 268 The finish date of the task.
Start 269 The start date of the task.
Work 270 The total person-hours scheduled for the task, in minutes.
StartSlack 271 The duration between the Early Start and Late Start dates for the task.
Status 272 The status of the task: Complete = 0, on schedule = 1, late = 2, future task = 3, status not available = 4.
Successors 273 The IDs of the task's successors.
StatusManager 274 The enterprise resource responsible for accepting or rejecting assignment progress updates for the task.
TotalSlack 275 The total slack time for the task, in minutes.
TaskGUID 276 The GUID of the task.
Type 277 The way the task is calculated: Fixed units = 0, fixed duration = 1, fixed work = 2.
WBS 278 The work breakdown structure code of the task.
WBSPREDECESSORS 279 The work breakdown structure codes of the task predecessors, separated by the list separator.
WBSSUCCESSORS 280 The work breakdown structure codes of the task successors, separated by the list separator.
WSSID 281 The ID of the task in a SharePoint list, for a project that is synchronized with a SharePoint tasks list.

Remarks

A ProjectTaskFields constant can be used as a parameter of the getTaskFieldAsync method.

For more information about working with fields in Project, see the Available fields reference. In Project Help, search for Available fields.

Support details

A capital Y in the following matrix indicates that this enumeration is supported in the corresponding Office host application. An empty cell indicates that the Office host application doesn't support this enumeration.

For more information about Office host application and server requirements, see Requirements for running Office Add-ins.

Supported hosts, by platform

Office for Windows desktop Office Online (in browser)
Project Y
Add-in types Task pane
Library Office.js
Namespace Office

Support history

Version Changes
1.0 Introduced

See also

Other resources

getTaskFieldAsync method

Available fields reference